欢迎来到济南锦山绣水园林工程有限公司官方网站
热销产品关键词: 济南假山制作 济南上水石假山 济南庭院景观
产品 新闻
  • 济南上水石假山
  • 济南真石假山
  • 济南庭院景观
新闻中心
新闻推荐
联系我们
  • 服务热线:15610114816
  • 地址:济南市仲宫镇商家
新闻中心
当前位置:首页 > 新闻中心 > 新闻中心 > 假山的用量怎样算

假山的用量怎样算

来源:http://www.sdjnjingguan.com/news/480.html  更新时间:2022-03-28
正常情况下假山的用量都是按吨卖的,那么这些假山石多少钱一吨?就拿我们的石假山石料是按吨出售,普通的价格为200-320元每吨左右,包含装车费用,卸车及运费不包括在内。
Under normal circumstances, the amount of rockery is sold by ton, so how much are these rockery stones per ton? Take our rockery stone, which is sold per ton. The ordinary price is about 200-320 yuan per ton, excluding loading expenses, unloading and freight.
石假山石料是怎样吊运的?选好石头以后,按施工方准备好吊机,选择好运输路线,并查看整条运输线路是否有桥梁,要注意选择承重做到平衡。在施工现场一定要注意工作。
How are rockery stones hoisted? After the bridge is ready, the crane shall be selected and the transportation route shall be balanced. Pay attention to work at the construction site.
石假山施工时怎样做到“拼石”?
How to "spell the stone" during the construction of stone rockery?
当所选到的石块不够高大或石形在施工过程中有损坏、破皮、折断的时候,就需要使用几块造型差不多的石块拼合在一起,这样的方法就叫遮丑。如果石块与石块中间的高度不够怎么办?可按照大概尺寸选一块形状差不多的石头掂在大石的底部,使它们整体更高,尽可能的选接口处形状比较吻合的石拼凑在一起。
When the selected stone is not tall enough or the stone shape is damaged, skinned or broken in the construction process, it is necessary to use several stones with similar shape to put them together. This method is called concealing ugliness. What if the height between the stone and the stone is not enough? You can choose a stone with similar shape according to the approximate size and weigh it at the bottom of the big stone to make them higher as a whole. Select the stones with the same shape at the interface as much as possible.
石假山石料的底座怎么设置?这个问题很重要,我们经常接到客户来的电话咨询假山地基怎么做。底座许多地方也叫做基座,基座可由砖块砌成厚厚的城墙状,也可以彩用稳实的石墩状,要将这些基座半埋在水平线以下的地表,应根据石假山石料的预埋方向及水池的深也要定好尺寸开挖,挖好以后在坑底再铺一层10-25厚的混凝土,现在我们就可以静静等待基座的凝固(大概需要7天左右)然后就可以施工这座石假山了。
How to set the base of stone rockery? This problem is very important. We often receive calls from customers to ask how to do the rockery foundation. Many places of the base are also called the base. The base can be made of bricks into a thick wall shape or solid stone pier shape. To bury these bases half on the surface below the horizontal line, the size of the base should be determined according to the embedding direction of the stone rockery and the depth of the pool. After excavation, a layer of 10-25 thick concrete should be paved at the bottom of the pit, Now we can wait quietly for the foundation to solidify (about 7 days) and then we can construct this stone rockery.
以上就是为大家介绍的有关园林假山制作的详细介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以专业的态度,为您提供服务http://www.sdjnjingguan.com
The above is a detailed introduction to the production of garden rockery. I hope it will help you If you have any questions, please contact us We will provide you with professional service http://www.sdjnjingguan.com
相关新闻
相关产品