家庭版的假山制作的制作流程

来源:http://www.sdjnjingguan.com/content-21-342-1.html  更新时间:2020-09-08
现在人们开始越来越重视精神文化建设,比如说越来越重视家居装饰。在家居装饰中,人们喜欢的有盆景假山、水泥假山等。
Now, people begin to pay more and more attention to spiritual culture construction, for instance, more and more attention is paid to home decoration. In home decoration, people like bonsai, rockery, cement, rockery and so on. 
1、定位放样:根据施工总平面图,进行场地整理,畅通道路,对实地进行勘查,复核标高及与周围建筑的相互位置关系,确定施工范围。
1, positioning lofting: according to the general plan of construction, site consolidation, clear the road, the field investigation, review the elevation and the surrounding building of the relationship between each other, determine the scope of construction.
2、打底:放样开线挖土方浇混凝土垫层打基础。
2, rendering: excavation line lofting concrete cushion foundation.
3、预埋件埋置:预埋件位于现浇砼上表面时,据预埋件尺寸和使用功能的不同,有如下3种固定方式。
3, embedded parts embedded in embedded parts: Cast-in-place Concrete on the surface, according to the embedded size and the use of different functions, there are 3 kinds of fixation methods.
(1)平板型预埋件尺寸较小,可将预埋件直接绑扎在主筋上,但在浇筑砼过程中,需随时观察其位置情况,以便出现问题后及时解决。
(1) flat plate embedded parts are small in size, can be directly embedded in the main bar lashing, but in the concrete pouring process, the need to observe the position at any time, in order to solve the problems in a timely manner.
(2)角钢预埋件也可以直接绑扎在主筋上,为了防止预埋件下的砼振捣不密实,应在固定前先在预埋件上钻孔供砼施工时排气。
(2) steel angle can also be directly binding on the main bar, in order to prevent the concrete vibration under non compacting ramming embedded parts, should be fixed before drilling for concrete construction in embedded parts exhaust.
(3)面积大的预埋件施工时,除用锚筋固定外,还要在其上部点焊适当规格角钢,以防止预埋件位移,必要时在锚板上钻孔排气。对于特大预埋件,须在锚板上钻振捣孔用来振实砼,但钻孔的位置及大小不能影响锚板的正常使用。
(3) the construction of large area of embedded parts, except fixed with anchor reinforcement, but also in the upper part of the appropriate specifications of spot welding angle, in order to prevent the embedded displacement, when necessary in the anchor plate hole exhaust. For large embedded parts, vibration compaction shall be used to drill hole concrete in the anchor plate, but the drilling position and size can not affect the normal use of the anchor plate.