欢迎来到济南锦山绣水园林工程有限公司官方网站
热销产品关键词: 济南假山制作 济南上水石假山 济南庭院景观
产品 新闻
  • 济南上水石假山
  • 济南真石假山
  • 济南庭院景观
新闻中心
行业新闻
当前位置:首页 > 新闻中心 > 行业新闻 > 假山施工现场管理不容忽视

假山施工现场管理不容忽视

来源:http://www.sdjnjingguan.com/content-21-239-1.html  更新时间:2019-07-25
  塑料假山石头工人适合没有技术,现场管理也很重要,一些在施工注意事项,以避免意外事故,今天为大家介绍塑料假山石头建筑工地管理系统,换句话说,它是一个系统的景观工程,需要多个类型的参与的工作,为了完成一个好的塑料假山石头作品。
  Plastic rockery stone worker is suitable for no technology, site management is also very important, some matters needing attention in construction to avoid accidents. Today, we introduce the management system of plastic rockery stone construction site. In other words, it is a systematic landscape engineering, which requires many types of work to participate in, in order to complete a good plastic vacation. Mountain Stone Works.
  定期开展工程质量知识教育,提高工人的操作水平和技术水平,在施工关键部位进行现场指挥和技术指导。此外,项目部领导和施工队必须坚决执行上级下达的各项质量管理文件、法规、规范和标准,牢固树立“质量第一”的理念,以高质量、优生产、用户至上为目标。
济南真石假山
  Regularly carry out engineering quality knowledge education, improve the operation level and technical level of workers, and conduct on-site command and technical guidance in key parts of construction. In addition, the leadership of the project department and the construction team must resolutely implement the quality management documents, regulations, norms and standards issued by their superiors, firmly establish the concept of "quality first" and aim at high quality, excellent production and customer first.
  此外,项目部和施工队伍必须有管理机构和系统,以确保项目的质量,和特殊人员负责施工质量的检验和验证记录,并谨慎地使施工记录和隐蔽工程验收和签证记录,整理和完善技术资料,确保施工质量符合要求。
  In addition, the project department and the construction team must have a management body and system to ensure the quality of the project, and special personnel are responsible for the inspection and verification records of the construction quality, and carefully make the construction records and concealed engineering acceptance and visa records, collate and improve technical information to ensure that the construction quality meets the requirements.
  塑石假山施工现场的工程质量管理必须按照施工规范的要求实施,确保每一道工序和施工质量都符合验收标准。坚持各分项工程施工,分公司工程自检,质量好,不符合要求不办理下一道工序施工。严格控制材料质量,不合格材料不准使用,不合格产品不准进入施工现场。在工程施工前,对工程所需材料进行及时的检测和试验。未经材料检验合格的,不得进行隐蔽工程施工。
  The engineering quality management of the construction site of plastic rockery rockery must be carried out in accordance with the requirements of construction specifications to ensure that each working procedure and construction quality meet the acceptance criteria. Insist on each sub-project construction, branch project self-inspection, good quality, do not meet the requirements of the next process of construction. Strict control of material quality, non-conforming materials are not allowed to use, and non-conforming products are not allowed to enter the construction site. Before the construction of the project, the materials needed for the project should be inspected and tested in time. No concealed construction shall be carried out without qualified material inspection.
  上面的几个管理系统是塑料假山施工的重点,以确保上述多个系统的早期阶段,考虑到施工质量和效果的塑料假山石头,项目先做安全第一,防止安全事故的发生,以确保项目的正常质量。
  The above management system is the focus of plastic rockery construction to ensure the early stage of the above-mentioned systems. Considering the quality and effect of the construction, the project should first do safety, prevent the occurrence of safety accidents, and ensure the normal quality of the project.
  以上是济南真石假山制造商为大家整理的相关内容,想要了解更多内容,欢迎访问网站:http://www.sdjnjingguan.com
  The above is the related content of Jinan Zhenshi Rockery Manufacturer. For more information, please visit the website: http://www.sdjnjingguan.com.