  济南假山制作施工的第一阶段的程序,首先是定位与放线,其次是进行基础施工,再次就是做山脚部分。山脚部分作好后才能进入第二阶段即山体造型。

  Ji'nan rockery production of the first phase of the construction process, first of all positioning and caving, followed by basic construction, and once again do the foot of the mountain. At the foot of the hill, the second stage can be reached, namely, the mountain shape.

  1、济南真石假山的定位与放线。

  1, Ji'nan true stone rockery positioning and line.

  首先在平面设计图上按5m*5m或者10m*10m(小型的塑石假山也可以用2m*2m。)的尺寸绘出方格图,在假山周围环境中找到可以定位依据的建筑边线,围墙边线,或园路中心线,并标出方格的定位尺寸。

  First of all, in the graphic design, press 5m*5m or 10m*10m (small stone rockery can also use 2m*2m) Draw a grid plan, and find the construction line, the fence line, or the center line of the garden road in the surrounding environment of the rockery, and mark the location size of the square.

  按照设计图的方格网及定位关系,将方格放大到施工场地的地面,小型假山,方格网可以直接用白灰画到场地;大型假山,可以借助用测量仪将各方格交叉点测到地面,并在点下做上标记。
济南上水石假山价格

  According to the relationship between grid and positioning design, will be enlarged to the construction site of the ground grid, small rockery, the direct use of lime to the site can grid; large rockery, can use the measuring apparatus for each grid intersection on the measured ground, marking and in point.

  2、假山基础施工

  2, rockery foundation construction

  假山基础施工可以不用开挖地基而直接将压实压平就可以做基础层,这样就可以减少土方工程量。济南工程景观当然,如果假山设计中要求了开挖基础槽的,就还是应挖了基槽再做基础。在做基础时,一般应将地基压实,然后再按设计摊铺和压实基础的各结构层,只有做桩基础可以不要压实地基,而直接打下基础桩。

  Rockery foundation construction, you can not dig the foundation, and directly compaction, compaction, you can make the base layer, so that you can reduce the amount of earthwork. Ji'nan landscape engineering course, if the design requirements of the rockery base excavation groove, it should dig trench to do foundation. In the foundation, the foundation should be compacted, and then according to the design of paving and compaction of the basic structure of the layer, only if the pile foundation can not compaction foundation, and directly hit the foundation pile.

  济南假山制作一般以混泥土基础为主,首先要开挖(也可不开挖)槽基,槽基的开挖范围应以按地基绘出的基础施工边线确定,应比山脚线宽50cm。槽基一般挖50cm到60cm深。然后再做混泥土基础。

  Ji'nan really stone rockery generally to the foundation of the soil, first of all to dig (also can not dig) trough foundation, groove foundation excavation range should be based on the foundation of the construction of the construction line determined, should be more than the bottom of the line width of 50cm. The trough foundation generally digs 50cm to 60cm deep. And then make the clay foundation.

  本文由济南假山制作为您提供,我们的网站是:http://www.sdjnjingguan.com/我们将以全心全意的热情为您提供更优质的服务,欢迎您的访问!